Harrisdale School
Location
Year of completion
Services Included
Handrail, Accessibility/Disabilty Ramps
Scope
Building Type
Job Size
30-meters-long Handrail
60-meters-long Accessibility/Disable Ramps
Builder
Challenges
This project was challenge to successfully complete the project on time while upholding the quality. Since, the railing had to be installed in school, the end product had to be structurally sound and built according to BCA standards. We performed detailed review on architectural review and provided by feedback with our expertise which assured minimum delay in project.
Approach
Regular meeting with building assured the design and completion requirement are clearly understood by the project manager. The scope was discussed with technicians to develop efficient methods of project completion.
Outcomes
Our team had successfully completed project before schools resumes. Students were able to use handrails and walk safely around the school. Hence, parents could comfortable send their children in safe environment.